The conference will bring together over 100 attendees, from a range of networks as well as every area of campus life, from the Further and Higher Education sector. Attendees include those responsible for environmental management, estates and facilities, teaching staff, as well as senior leaders and students.
Displaying 3 results
A case study of the work d+b facades carried out on Blackpool & The Fylde College to repair, restraint and stabilise existing external buildings.
Tags: construction | design | aluminium | build | insulation
Phase 1 overcladding of the University of Bradford’s Richmond Building was completed in 2006 – Phase II was undertaken nearly 10 years later!
Tags: construction | refurbishment | refurbish | aluminium
This case study demonstrates how d +b facades designed and built an insulated aluminium rainscreen covering 9,800m2 and 2,000 replacement windows.
Tags: construction | refurbishment | refurbish | renovation | aluminium
The number one resource
for sustainability in post-16 education
Sign up for sustainability news and updates from EAUC